Clayton/Rabun County Water and Sewer Authority
Rabun County, Georgia-Evalution
2009 - 2.0 MGD water treatment plant packaged surface water treatment system. Principals were involved in evaluating the City’s surface water treatment plant as well as distribution system. In 2009 with practically a new board for the CRCWSA EMI was requested to evaluate the status of the treatment facility and distribution system to include three pump stations and four water storage tanks. Following EMI’s evaluation of the water system the CRCWSA upon recommendations, cost analysis and assistance from EMI rebuilt two of the clarifiers at the surface water plant as well as replaced several hundred feet of corroded electrical and SCADA conduit. Additionally, the CRCWSA replaced an electrical soft start at one of the booster pump stations and upgraded the SCADA system at the surface water treatment plant.